Tuesday, February 8, 2022

SMR Tool v3.5 dated 04.02.2022 Download Link & Working Procedure

  Admin       Tuesday, February 8, 2022

SMR v3.5 dated 04.02.2022:

As per requests received from various end user, the following modification done.
  • Section II Page Modification done for ABCDE Statement for both Cash and Stamp.
  • PA17A - Page No.2 Data More accurate i.e 100% accuracy arrived.
  • Material Master Modification option enabled - Press F1 from SMR Tool v3.5. (Auto populated in version 3.0)
  • -Ve symbol has been removed from Cash Remittance / Cash Sent to BO
  • + Removed from Stamp Received/Sent if it is Nil

FAQ v1.1

1. Runtime Error INVALID PROPERTY VALUE '380' during Cash Uploading

  • Check the Input File > FAGLL03.xlsx should have GLs 4867100000 4867100010
  • Redownload from SAP - FAGLL03 tcode using the above GLs.
2. Please "Run Start Database and execute this from Server"
  • SMR Tool Latest version should be run from POS Server if the Generation of 2nd Page is checked in Configuration.

3. Invalid Property Value during Stamp Uploading

  • Error Fixed

Function Keys added in SMR Tool:

F1 - MaterialMater Configuration.
F3 - Upload Total Receipts and Total Payments from Rough.XLSX. (Format given below).
F4 - Upload SMR data from Input Folder.
F9 - Check Total Receipts & Payment with Closing Balance.
F10 - Generate Reports.

What's New in SMR Tool V3.0?

  1. SMR Tool v3.0 designed for generating SMR Report of both pages Section II and PA17A.
  2. Option for changing Input SMR folder location.
  3. Either EOF or BOF is True while Collecting Stamp Balance data.
  4. Material Maintenance options added and its auto-populated when needed. 
  5. Configuration Window Changed as per requirement & validation.
  6. Copy GLs added for copying GLs for generating FAGLL03 in SAP for the purpose of generation of PA17A - next page SMR.
  7. Section II alone can generate using the version v3.0.
Watch the Video Till End for better understanding (Just 5mins will save your entire day of work in c/w SMR)

How its work and what kind of reports given?

SMR v3.0 Deigned for generation of Section II alone or Section II alongwith PA17A. This can be configured under Configuration Window. Hence, the following Input needed based on requirement of SMR

Reports requirement for Generating Section II alone?

  • Can execute anywhere and any PC. No need POS Server.
  • FAGLL03 - DOP Cash & Cash in Transit of AO & its BO. (For calculating CB of AO and BO & Cash received/Sent from Cash Office/Bank & BOs). FAGLL03.xlsx
  • MB51 of concern AO Storage Location. (for Calculating Stamp CB of AO).MB51.xlsx
  • MB5B of concern AO for the Start date of SMR Period. (for the purpose of OB of Stamp Balance). MB5B.txt Read More

Reports requirement for generation of both pages of Section II and PA17A?

  • Should be executed from POS Server for collection POS data and information.
  • Reports as Mentioned above for generating Section II in addition to the below. (3 Reports)
  • Finacle - Common Account Statistical Reports(2Reports)  - Report Number 13 in MIS server. Generate Report in excel format for the current month / corresponding month of previous year.
Naming Structure should be (Year of Start Date).xls & (Year of Start Date)-1.xls | i.e if the start date is 28.12.2021 and end date 27.01.2022 the current period common account statistical report name should be 2021.xls and previous year corresponding month report should be 2020.xls

In default, the report generation in Finacle only with the extension of *.xls. Report generation for same report in different period is allowed by the Finacle Live/MIS Server the time interval of 10mins

  • FAGLL03-SAP Reports for PA17A(2Reports)  - Click Copy GLs in SMR Tool v3.0 and Invoke FAGLL03 in SAP Module and Paste the GLs in FAGLL03, the posting date as same SMR Generation period and Profit Center - AO Profit Center alone. Export the report in Excel format which has latest extension of .xlsx. Go Back Change Posting Year with the same date and month
Naming Structure should be (Year of Start Date).xlsx & (Year of Start Date)-1.xlsx | i.e if the start date is 28.12.2021 and end date 27.01.2022 the current period FAGLL03 should be 2021.xlsx and previous year corresponding month report should be 2020.xlsx

Totally, 7 Reports needed for generating Section II & PA17A SMR Report.

Click below link to download the SMR Tool v3.0

Subscribe PoTools Telegram Channel

Subscribe PoTools Youtube Channel

DOWNLOAD


DOWNLOAD SUPPORTING FILES

logoblog

Thanks for reading SMR Tool v3.5 dated 04.02.2022 Download Link & Working Procedure

Previous
« Prev Post

No comments:

Post a Comment

Labels

Aadhar Account Closure Account Conversion Account Extension Account Inquiry Account Modification Account Open Account Renewal Account Transfer Accounting Procedure Agent Agent Menu Agent Portal Already Loggin Issues Android App Annual interest Run APAR Applet Error Application Form Atal Pension Yojana ATM ATM card issue procedure ATM Charges Auditors Authorized Person Average balance Balance Inquiry Banking Software Banner BCP BNPL BO Settlement Account Branch Office Browser Bulk Discharge Bulk Transactions Calendar of Examination Cash Balance Cash Deposit Cash Loading Cash Management Report Cash Withdrawal CBS CBS Migration CBTM CCMM CCRC Central Government Employees CEPT Instructions Certificates Change Interest Rate Cheque Book Cheque Clearance CICD CIF Claim Closure Claim Limits Clarification Closure CMRC CNAC Commission Common issues Consolidation Reports COVID19 Guidelines CPC CPC Activities CPDTM CRDACM CRDP Credentials Credit Card CRESET CSAC CSCCAAC CSI CTM CTS Integration Current Year Interest CUSTAUTH Customer Inquiry CXFER Daily Reports DARPAN Data Migration Command Centre DC Closure DC Closure Instruction Death Closure Defence Demonetisation Deposit Limit Directorate Clarifications Directorate Orders Discontinued Accounts Divisional Office DOP DOP Orders Dormant Account Dropbox Duplicate ATM Duplicate Certificate Duplicate Passbook E-Sign eBanking ECS eKYC Electronic Clearance System Eligibility Criteria Engagement EOD EOY in Finacle Error Code Excess Payment EXCW FAQ Finacle Finacle Menu Finacle Menu belongs to BO Finacle Session Finacle Slowdown Finacle Solution Finacle Speed Finacle Tips Finacle Work flow Financial Year FMenu Forms Freeze Functioning Status General Generate Report GL Code GL Integration GPF Greetings Guide for Finacle HAALM HABI HACCDET HACI HACS HACSP HACXFRSC HACXFSOL HAFI HAFSM HAGTXP HAITINQ Half Margin Memo Handling Cheque HCAAC HCAACTD HCASHPND HCCA HCCFM HCHBI HCHBM HCRT HCUDET HCULA HDSAMM Helpdesk HFINRPT HFTI HFTR HIARM HIMC HINQACHQ HINTTM HIOT HIRM HISCOD HISRA HNAC Holiday HPBP HPBPR HPSP HSSI HTDREN HTDTRAN HTM HTTUM HTV HXFER IES Incentive Income Tax Inquiry on Cheques Inspection Instant ATM Card Interest Calculation Interest Flow Interest Inquiry Interest Payment Interest Rates Interest Recovery Interest Statement Internet Banking Internet Explorer Settings InterSOL Transaction Inventory Inward Clearing IP/ASP/SP IPPB IPPB Manual IR Entry Jansuraksha Java Settings Joint to Single Account KVP KYC Document Ledger Print Lesson 1 Lesson 10 Lesson 11 Lesson 12 Lesson 13 Lesson 14 Lesson 15 Lesson 16 Lesson 17 Lesson 19 Lesson 2 Lesson 3 Lesson 4 Lesson 5 Lesson 6 Lesson 7 Lesson 8 Lesson 9 Lien Live Account Report Loan Account Lock up Period Lok Shaba Mahila Samman Savings Certificate Scheme Maturity Value Memo Pad MGNREGS Micro ATM Minor Account MIS MIS Server Missing Credits Mobile Banking MPKBY MSSC MSSP MSY Name Transfer NEFT New Account Number Nomination Non Migrated Not Transactions NREGA NSC NSS NSS 92 NSS Closure NSS87 Number Account Opened Scheme wise Report Number of Transactions Office Account Online Recruitment Online Training OSL date Outward Cheques Overview Pamphlets Partially Posted Transactions Partly Posted Transactions Passbook Print Passbook view Password Reset Patch Deployment Payment Bank Pending for verification Personalized ATM Card Pledge PMJJBY PMSBY PO Finacle Guide POSB Manuals Post Info Postal Life Insurance Postal Manual PPF Precautions Premature closure Prevent Frauds in CBS Offices Preventive Maintenance Procedure in Finacle PRSS Scheme Public Notice RBI RD RD Commission RD Default RD Deposit RD Verification Re-investment Ready Reckoner Recruitment Reference Register Regularization Reinvestment Relaxations Report Server Reversal Review RICT ROLE / SOL change RTGS Rules Rulings Rural Postal Life Insurance Salary / Pension Sanctioning Authority SAP Saving Account SB SB Counter Tool SB LOT SB Order SBCO SCSS Seeding of Aadhaar and Mobile Number Senior Citizen Welfare Fund Server Maintenance Service Charges Service Request Settings Short Payment Shortcut Keys Sign Off Signature Single Hand Post Office SMR SMS Banking SMS Notification Software Softwares SOL ID Solution Special Arrangements SSA SSA Default Fee Collection Standard Operating Procedure Standing Instructions Stop Payment Sub ledger Code Suggestions Super Agent ID Survey System Administrator TD TDS Teller TimeoutFix TIPM Tool for Mapping Account Number Tools Trail Closure Training Transaction Holiday Transaction Inquiry Transaction Issues TTUM UCR UnFreeze Union Unlock user Unverified Accounts User Guide Value Date Vault Operation Verification of High Balance Video Tutor Wedding Expenses Withdrawal Windows 10 Workshop Wrongly Migrated