DC Closure instruction on 10.10.2015 in DOP Finacle

DC Closure Status on 10.10.2015

DC closure was expected by 1700 hours


DC Closure 3rd step is in execution. As requested by Infosys, EOD 1st and 2nd  menus  are disabled.
After completion of DC Closure, the same will be enabled.

Common Instrcutions

  • Office with blockings must remain at office until they clear the blocking validations
  • Check HFTI --> Entered/Posted Transactions and make sure there is no Blocking 

EOD Instructions

  • Complete all work including verification by 3/4 PM * Verify the transactions from the beginning. Don't leave them for the last time.
  • BO transactions : If there are a lot BO Posting, then either Do it but simultaneously verify it too or Do it In next date early morning. 
Also since a large no of data migration is there, so there will be a huge pressure of completing EOD timely. So it would be better to follow these suggestions. Make sure even if there is a network problem, your all Blocking Validations should be cleared before that.

Post a Comment

0 Comments

Labels